Gas District Cooling (GDC) Plant 1, Putrajaya

Project Details

Gas District Cooling (Putrajaya) Sdn Bhd Client
Gas District Cooling (Putrajaya) Sdn Bhd
EPCC, Private Sector Project Type
EPCC, Private Sector
RM 152mil <span>(USD 37mil)</span> Project Value
RM 152mil (USD 37mil)
Project Status Status
Completed (2019)
USD 1 = RM4.08

Project Description

Engineering, Procurement, Construction and Commissioning (EPCC) at Gas District Cooling (GDC) for:

  1. Chilled Water Supply System, Cooling Towers, Auxiliary Gas Boiler, Chilled Water Piping , Thermal Energy Storage Tank, New Annex 2 Building, New Electrical System
  2. Thermal Energy Storage (TES) tanks, each of 27.8m in height and 24.5m in diameter, with a total capacity of 50,000 RTh

1st in Malaysia to use the Synchronised Electrical Chain Hoisting method to construct the steel TES tank by lifting each section of the tank’s shell into place. This method enables faster and safer construction. This was the 3rd Gas District Cooling Plant project constructed by SunCon.


Awards

Award

Malaysian Society For Occupational Safety and Health (MSOSH) Occupational Safety and Health (OSH) Award – Gold Class I Award 2017