MRT SBK Line Package V4

Project Details

Mass Rapid Transit Corporation Sdn Bhd (MRT Corp) Client
Mass Rapid Transit Corporation Sdn Bhd (MRT Corp)
Conventional, Public Sector Project Type
Conventional, Public Sector
RM 1.17bil <span>(USD 285mil)</span> Project Value
RM 1.17bil (USD 285mil)
Total Length Total Length
6.5KM
Total Piers Total Piers
198
Total Spans Total Spans
227
Project Status Status
Completed (2016)
USD 1 = RM4.08

Project Description

Part of the MRT Sungai Buloh-Kajang Line, Malaysia’s first MRT.

Construction of elevated viaduct guideway with 3 elevated stations:

  • Phileo Damansara (Section 16) Station located beside the SPRINT Highway with a 100 meter Pedestrian Link Bridge
  • Pusat Bandar Damansara Station located at one of the busiest junctions connecting SPRINT Highway to Bangsar
  • Semantan Station, the most iconic station with the longest supporting portal crossing 6 lanes above the SPRINT Highway at Semantan

Challenges:

  • Construction carried out on a steep slope beside the busy SPRINT Highway, crossing multi-level junctions above existing highways, bridges and rivers and connecting to a tunnel at an adjoining package.
  • Construction of 30m high pier, the highest pier for this project, which involved a total of 10 castings.
  • As a reputable and committed Work Package Contractor (WPC), SunCon was also responsible for managing the Nominated Subcontractors (NSC), Designated Contractors (DC) and Designated Suppliers (DS) to ensure the project was delivered to the highest safety and quality standards, while meeting the project budget. In addition, SunCon was responsible for the interfacing with track works, system works, signalling, noise barriers as well as tunnelling.

Awards

Award

Safety & Health Assessment System (SHASSIC) 5 Star rating